(a) General information. Permits issued under this section are subject to the requirements of §219.41 of this title (relating to General Requirements).
(1) Annual self-propelled oil well servicing unit permits. The fee for an annual self-propelled oil well servicing unit permit is $52 per axle. The indirect cost share is included in this fee.
(2) Annual oil field rig-up truck permits.
(A) An oil field rig-up truck permitted under this section must not exceed:
(i) legal height or length limits, as provided in Transportation Code, Chapter 621, Subchapter C;
(ii) 850 pounds per inch of tire width on the front axle;
(iii) 25,000 pounds on the front axle; or
(iv) legal weight on all other axles.
(B) An oil field rig-up truck, operating under an annual permit, must be registered in accordance with Transportation Code, Chapter 502.
(C) The annual permit fee for an oil field rig-up truck is $52. The indirect cost share is included in this fee.
(D) An annual permit for an oil field rig-up truck allows the unit to travel at nighttime, provided the unit does not exceed nine feet in width.
(3) A permit issued under this section may not be amended.
(4) A permit issued under this section allows travel on a statewide basis and on all state maintained highways.
(b) Permit application and issuance.
(1) An application for an annual permit under this section must be made in accordance with §219.41(b) of this title.
(2) Upon receipt of the application and the appropriate fees, the department will provide a copy of the permit to the applicant.
Source Note: The provisions of this §219.44 adopted to be effective February 21, 1999, 24 TexReg 1221; amended to be effective November 21, 1999, 24 TexReg 10143; transferred effective January 1, 2012, as published in the Texas Register January 27, 2012, 37 TexReg 359; amended to be effective June 28, 2015, 40 TexReg 4003; amended to be effective March 6, 2018, 43 TexReg 1283; amended to be effective July 18, 2024, 49 TexReg 5161