Sec. 2208.151. Time for Creation of Plan of Operation.
Sec. 2208.151. TIME FOR CREATION OF PLAN OF OPERATION. Not later than the 30th day after the date the pool is created, the board shall meet to prepare a detailed plan of operation for the pool.
Added by Acts 2005, 79th Leg., Ch. 727 (H.B. 2017), Sec. 2, eff. April 1, 2007.