(a) A DSA must ensure that a minor home modification is completed no later than 60 calendar days after one of the following dates, whichever is later:
(1) the date HHSC approves the proposed IPC that includes the cost of the minor home modification and inspection, as described in §259.275(e)(2) of this division (relating to Requirements for Authorization to Purchase a Minor Home Modification); or
(2) the effective date of the proposed IPC as determined by the service planning team.
(b) If a DSA determines that the minor home modification will not be completed within the time frame required by subsection (a) of this section, the DSA must notify the individual or LAR, and the case manager, in writing, of a new proposed date of completion. The proposed date of completion may not exceed 30 calendar days after the date required by subsection (a) of this section.
Source Note: The provisions of this §259.283 adopted to be effective January 30, 2023, 48 TexReg 362