Emergency power equipment shall be tested at least once each week and the electric load transferred to the circuits at least monthly.
Source Note: The provisions of this §263.56 adopted to be effective December 19, 1994, 19 TexReg 9526.
Emergency power equipment shall be tested at least once each week and the electric load transferred to the circuits at least monthly.
Source Note: The provisions of this §263.56 adopted to be effective December 19, 1994, 19 TexReg 9526.