(a) Applicability. All public water systems that use groundwater, except public water systems that combine all of their groundwater with surface water or with groundwater under the direct influence of surface water prior to treatment as described in §290.111 of this title (relating to Surface Water Treatment), must comply with one or more of the treatment techniques and corrective actions of this section if a raw groundwater source sample collected under §290.109(d)(3)(C)(ii), (4)(B), (C), or (E) of this title (relating to Microbial Contaminants) was positive for fecal indicators, or if a significant deficiency was identified, or if the system is not required to conduct raw groundwater source monitoring because it provides at least 4-log treatment of viruses at each groundwater source. At the discretion of the executive director, a public water system not excluded under this subsection, shall comply with the requirements of this section after exceeding a treatment technique trigger as described in accordance with §290.109 of this title. A public water system shall comply with provisions of §290.109(d)(3)(C)(ii), (4)(B), (C), or (E) of this title except in cases where the executive director determines that the sample collected under §290.109(d)(1) and (2) of this title meets the executive director's criteria for invalidation as described in §290.109(e)(1) of this title. A public water system with a groundwater under the direct influence of surface water (GUI) or surface water/groundwater blended source(s), which provides disinfection and filtration, shall comply with provisions of this section except in cases where the executive director determines that the significant deficiency is in a portion of the distribution system that is served solely by surface water or groundwater under the direct influence of surface water.
(1) A groundwater system must provide written notification to the executive director that it is not required to meet the raw groundwater source monitoring requirements under §290.109(d)(4) of this title because it provides at least 4-log treatment of viruses for the specified groundwater source and must begin compliance monitoring in accordance with subsection (c) of this section. The notification must include engineering, operational, and other information required by the executive director to evaluate the submission. If the executive director determines and documents in writing that 4-log treatment of viruses is no longer necessary for a specified groundwater source or if the system discontinues 4-log treatment of viruses before the first connection for any groundwater source, the system must document this in writing and conduct raw groundwater source sampling as required under §290.109(d)(4) of this title. If the public water system discontinues 4-log treatment it shall receive prior approval in writing from the executive director that 4-log treatment is no longer necessary for that groundwater source.
(2) A groundwater system that places a groundwater source in service after November 30, 2009, that is not required to meet the raw source monitoring requirements under §290.109(d)(4) of this title because the system provides at least 4-log treatment of viruses for a specified groundwater source must begin compliance monitoring within 30 days of placing the source in service in accordance with subsection (c) of this section. The system must provide written notification to the executive director that it provides at least 4-log treatment of viruses before the first connection for the specified groundwater source. The notification must include engineering, operational, and other information required by the executive director to evaluate the submission. The system must conduct triggered source monitoring under §290.109(d)(4) of this title until the executive director provides written approval of the system's request to provide the 4-log treatment. If the system discontinues 4-log treatment of viruses before the first connection for a groundwater source, the system must conduct raw groundwater source sampling as required under §290.109(d)(4) of this title. If the public water system discontinues 4-log treatment it shall receive prior approval in writing from the executive director that 4-log treatment is no longer necessary for that groundwater source.
(b) Groundwater corrective action plan. All public water systems using groundwater must submit a corrective action plan and implement corrective action if a raw groundwater source sample was positive for fecal indicators or if a significant deficiency was identified.
(1) If a groundwater source sample was found to be fecal indicator positive or if a significant deficiency was identified, the system must consult with the executive director regarding appropriate corrective action and have an approved corrective action plan in place within 30 days of receiving written notification from a laboratory of the fecal indicator positive source sample collected under §290.109(d)(4) of this title or within 30 days of receiving written notification from the executive director of the identification of a significant deficiency.
(2) Within 120 days of receiving written notification from a laboratory of the fecal indicator positive source sample or receiving written notification from the executive director of a significant deficiency, the system must have completed corrective action or be in compliance with an approved corrective action plan and schedule.
(3) Any changes to the approved corrective action plan or schedule must be approved by the executive director.
(4) The executive director may require interim measures for the protection of public health pending approval of the corrective action plan. The system must comply with these interim measures as well as with any schedules specified by the executive director.
(5) Systems that are required to complete corrective action must implement one or more of the procedures in this paragraph and the details of the implementation must be specified in the approved corrective action plan. If subparagraph (A) or (F) of this paragraph is selected as part of the corrective action plan, then subparagraph (B), (C), (D), or (E) of this paragraph must also be selected.
(c) Microbial inactivation and removal requirements. A public water system that treats groundwater in response to a fecal indicator positive source sample or significant deficiency, instead of conducting raw groundwater source monitoring, shall meet minimum requirements demonstrating at least 4-log treatment of viruses before the water is distributed to the first connection of the specified groundwater source.
(1) Monitoring requirements for chemical disinfectants. Groundwater systems shall monitor the performance of the disinfection facilities to ensure that appropriate disinfectant levels are maintained every day the specified source serves the public. All monitoring conducted pursuant to the requirements of this section must be conducted at sites designated in the system's monitoring plan in accordance with §290.121 of this title (relating to Monitoring Plans).
(2) Monitoring and operating requirements for commission-approved alternative treatment, including ultraviolet light (UV) disinfection facilities, membrane systems, and other methods that can obtain 4-log inactivation or removal of viruses.
(3) Analytical requirements. All monitoring required by this section must be conducted at a facility approved by the executive director and using methods that conform to the requirements of §290.119 of this title (relating to Analytical Procedures).