Rule 303.81 Rate and Method of Diversion

The application must: (1) include the maximum rate of diversion for each diversion point in gallons per minute or cubic feet per second; (2) describe the method to be used as portable pump, stationary pump, or gravity flow; (3) include the location of point(s) of discharge and diversion. These locations must also be shown on the application maps with reference to a corner of an original land survey and/or other survey point of record, giving both course and distance; and (4) include the distance and direction from the nearest county seat or town. Source Note: The provisions of this §303.81 adopted to be effective October 26, 2006, 31 TexReg 8716
Gavvy last updated this database on: Aug 7, 2024