A production area authorization shall include for each production area:
(1) a mine plan;
(2) a restoration table;
(3) a baseline water quality table;
(4) control parameters upper limits;
(5) monitor well locations; and
(6) any special provisions determined appropriate by the commission.
Source Note: The provisions of this §305.155 adopted to be effective June 19, 1986, 11 TexReg 2598.