Sec. 31.011. PENDING LITIGATION. The commission may refuse to accept a permit application or hold a permit application hearing if any aspect of the siting, construction, use, or decommissioning of the subsurface excavation is the subject of litigation.
Added by Acts 1989, 71st Leg., ch. 2, Sec. 15.02(a), eff. Aug. 28, 1989.