(a) Definitions. The following words and terms, when used in this section, shall have the following meanings, unless the context clearly indicates otherwise:
(1) Active operation--Regular and continuing activities related to the production of oil and gas for which the operator has all necessary permits. In the case of a well that has been inactive for 12 consecutive months or longer and that is not permitted as a disposal or injection well, the well remains inactive for purposes of this section, regardless of any minimal activity, until the well has reported production of at least five barrels of oil for oil wells or 50 Mcf of gas for gas wells each month for at least three consecutive months, or until the well has reported production of at least one barrel of oil for oil wells or at least one Mcf of gas for gas wells each month for 12 consecutive months.
(2) Cost calculation for plugging an inactive well--The cost, calculated by the Commission or its delegate, for each foot of well depth plugged based on average actual plugging costs for wells plugged by the Commission for the preceding state fiscal year for the Commission Oil and Gas Division district in which the inactive well is located.
(3) Delinquent inactive well--An inactive well for which, after notice and opportunity for a hearing, the Commission or its delegate has not extended the plugging deadline.
(4) Enhanced oil recovery (EOR) project--A project that does not include a water disposal project and is:
(5) Good faith claim--A factually supported claim based on a recognized legal theory to a continuing possessory right in a mineral estate, such as evidence of a currently valid oil and gas lease or a recorded deed conveying a fee interest in the mineral estate.
(6) Inactive well--An unplugged well that has been spudded or has been equipped with cemented casing and that has had no reported production, disposal, injection, or other permitted activity for a period of greater than 12 months.
(7) Operator designation form--A certificate of compliance and transportation authority or an application to drill, recomplete, and reenter that has been approved by the Commission or its delegate.
(8) Physical termination of electric service to the well's production site--Disconnection of the electric service to an inactive well site at a point on the electric service lines most distant from the production site toward the main supply line in a manner that will not interfere with electrical supply to adjacent operations, including cathodic protection units.
(b) Plugging of inactive bay and offshore wells required.
(1) An operator of an existing inactive bay or offshore well as defined in §3.78 of this title (relating to Fees and Financial Security Requirements) must:
(2) The Commission or its delegate may not approve an extension of the deadline for plugging an inactive bay or offshore well if the plugging of the well is otherwise required by Commission rules or orders.
(c) Extension of deadline for plugging an inactive bay or offshore well. The Commission or its delegate may administratively grant an extension of the deadline for plugging an inactive bay or offshore well as defined by Commission rules if:
(1) the operator has a current organization report;
(2) the operator has, and on request provides, evidence of a good faith claim to a continuing right to operate the well;
(3) the well and associated facilities are otherwise in compliance with all Commission rules and orders; and
(4) for a well more than 25 years old, the operator successfully conducts and the Commission or its delegate approves a fluid level or hydraulic pressure test establishing that the well does not pose a potential threat of harm to natural resources, including surface and subsurface water, oil, and gas.
(d) Plugging of inactive land wells required.
(1) An operator that assumes responsibility for the physical operation and control of an existing inactive land well must maintain the well and all associated facilities in compliance with all applicable Commission rules and orders and within six months after the date the Commission or its delegate approves an operator designation form must either:
(2) The Commission or its delegate may not approve an extension of the deadline for plugging an inactive land well if the plugging of the well is otherwise required by Commission rules or orders.
(3) Except for an operator designation form filed for the purpose of a name change, the Commission or its delegate may not approve an operator designation form for an inactive land well until the operator satisfies the requirements of paragraph (1)(C) of this subsection.
(4) If an operator fails to restore the well to active operation as defined by Commission rule, plug the well in compliance with a Commission rule or order, or obtain an extension of the deadline for plugging an inactive well within six months after acquiring an inactive well, the Commission or its delegate may, after notice and opportunity for hearing, revoke the operator's organization report.
(5) The Commission or its delegate may approve an organization report that is delinquent or has been revoked if the Commission or its delegate simultaneously approves extensions of the deadline for plugging the operator's inactive wells.
(e) Extension of deadline for plugging an inactive land well. The Commission or its delegate may administratively grant an extension of the deadline for plugging an inactive land well if:
(1) the Commission or its delegate approves the operator's Application for an Extension of Deadline for Plugging an Inactive Well (Commission Form W-3X);
(2) the operator has a current organization report;
(3) the operator has, and on request provides evidence of, a good faith claim to a continuing right to operate the well;
(4) the well and associated facilities are otherwise in compliance with all Commission rules and orders; and
(5) for a well more than 25 years old, the operator successfully conducts and the Commission or its delegate approves a fluid level or hydraulic pressure test establishing that the well does not pose a potential threat of harm to natural resources, including surface and subsurface water, oil, and gas.
(f) Application for an extension of deadline for plugging an inactive land well.
(1) This subsection does not apply to a bay well or an offshore well as those terms are defined in §3.78 of this title.
(2) An operator must include the following in an application for an extension of the deadline for plugging an inactive well:
(g) Commission action on application for plugging extension.
(1) The Commission or its delegate shall administratively grant all applications for plugging extensions that meet the requirements of Commission rules.
(2) The Commission or its delegate may administratively deny an application for a plugging extension for an inactive well if the Commission or its delegate determines that:
(3) Except as provided in paragraph (2) of this subsection, if the Commission or its delegate determines that an organization report should be denied renewal solely because it does not meet the inactive well requirements of this section, a Commission delegate shall, within a reasonable time of not more than 14 days after receipt of the applicant's administratively complete organization report renewal packet, including all statutorily required fees and financial assurance: