When coming out of the hole with the drill pipe, drilling fluid shall be circulated until equalized, and a fill-up line shall be turned into the casing to insure a full load of fluid on the bottom of the hole at all times.
Source Note: The provisions of this §3.18 adopted to be effective January 1, 1976.