(a) Pre-operation reports.
(1) Well completion report. Within 90 days after the completion of the well, the permittee shall submit a Well Completion Report to the executive director addressing the considerations and standards in §331.45(2) of this title (relating to Executive Director Approval of Construction and Completion) and §331.163 of this title (relating to Well Construction Standards), and including a completed copy of the commission's Well Data Form, and a surveyor's plat showing the exact location and giving the latitude and longitude of the well. The report will also include a certification that a notation on the deed to the facility property or on some other instrument which is normally examined during title search has been made stating the surveyed location of the well, and the well permit number. The permittee shall integrate the data obtained into adjusted injection zone fluid transport calculations, and updated cross-sections of the injection zone, and shall include these items in the completion report.
(2) Cavern completion report. Within 90 days after the completion of the cavern, the permittee shall submit a Cavern Completion Report to the executive director addressing the considerations and standards in §331.45(2) of this title and §331.164 of this title (relating to Cavern Construction Standards), and including a surveyor's plat showing the exact location and giving the latitude and longitude of the cavern. The report will also include a certification that a notation on the deed to the facility property or on some other instrument which is normally examined during title search has been made stating the surveyed location of the cavern, the well permit number, the depth of the cavern floor and ceiling, the cavern diameter, the dates of operation, and its permitted waste streams. The permittee shall integrate the data obtained into adjusted injection zone waste transport calculations, waste front calculations and updated cross-sections of the injection zone and include these items in the completion report.
(3) Local authorities. The permittee shall provide written notice to the executive director in a manner specified by the executive director that a copy of the permit has been properly filed with the health and pollution control authorities of the county, city, and town where the well is located.
(4) Start-up date and time. The permittee shall notify the executive director in writing of the anticipated well construction and cavern construction start-up dates. Compliance with all pre-operation terms of the permit must occur prior to beginning injection operations. The permittee shall notify the executive director at least 24 hours prior to beginning drilling and cavern construction operations.
(5) Approval of construction and completion. Prior to beginning operations, the permittee shall obtain written approval from the executive director which states that the constructions and completions of the well and cavern are in compliance with the applicable provisions of the salt cavern solid waste disposal well permit. To obtain certification, the permittee shall submit to the executive director the following reports and certifications prepared and sealed by a professional engineer with current registration pursuant to the Texas Engineering Practice Act:
(b) Operating reports.
(1) Injection operation quarterly report. For noncommercial facilities only, within 20 days after the last day of the months of March, June, September, and December, the permittee shall submit to the executive director a quarterly report of injection operation on forms supplied by the executive director. These forms will comply with the reporting requirements of 40 Code of Federal Regulations §146.69(a). The executive director may require more frequent reporting.
(2) Injection operation monthly report. For commercial facilities only the following shall apply.
(3) Injection zone annual report. For all facilities, the permittee shall submit annually with the December report of injection operation an updated graphic or other acceptable report and description of the effects of the well and cavern on the area of review, including a report on monitoring required by §331.166(h) of this title (relating to Monitoring and Testing Requirements). To the extent such information is reasonably available the report shall also include:
(4) Workover reports. Within 30 days after the completion of the workover, a report shall be filed with the executive director including the reason for well workover and the details of all work performed and interpretations of all logs and data collected.
(5) Well mechanical integrity, cavern integrity, and other reports. The permittee shall submit within 30 days after test completion a report including both data and interpretation on the results of:
(6) Emergency report of leak or other failure. The permittee shall notify the underground injection control (UIC) staff of the Austin office and the local district office of the commission, within 24 hours of any significant change in monitoring parameters or of any other observations which could reasonably be attributed to a leak or other failure of the well equipment or cavern integrity.
Source Note: The provisions of this §331.167 adopted to be effective June 22, 1992, 17 TexReg 4097; amended to be effective January 2, 1995, 19 TexReg 10099; amended to be effective November 23, 2000, 25 TexReg 11433