Sec. 363.003. Duty to Repair; Forfeit of Tolls.
Sec. 363.003. DUTY TO REPAIR; FORFEIT OF TOLLS. (a) The contractor shall maintain the bridge during the term of the contract.
(b) A contractor who fails to maintain the bridge forfeits all right to the tolls.
Acts 1995, 74th Leg., ch. 165, Sec. 1, eff. Sept. 1, 1995.
Gavvy last updated this database on: Sep 6, 2024