Sec. 375.208. COMMISSION APPROVAL. A district must obtain approval of the commission as provided by Section 49.181, Water Code, only if the bonds are to provide water, sewage, or drainage facilities.
Added by Acts 1991, 72nd Leg., ch. 16, Sec. 13.05(a), eff. Aug. 26, 1991.
Amended by:
Acts 2023, 88th Leg., R.S., Ch. 1009 (H.B. 2815), Sec. 9, eff. June 18, 2023.