(a) Definitions. The following words and terms, when used in this section, shall have the following meanings, unless the context clearly indicates otherwise.
(1) Affected person--A person who, as a result of the activity sought to be permitted, has suffered or may suffer actual injury or economic damage other than as a member of the general public.
(2) Brine mining facility or facility--The brine mining injection well, and the pits, tanks, fresh water wells, pumps, and other structures and equipment that are or will be used in conjunction with the brine mining injection well.
(3) Brine mining injection well--A well used to inject fluid for the purpose of extracting brine by the solution of a subsurface salt formation. The term "brine mining injection well" does not include a well used to inject fluid for the purpose of leaching a cavern for the underground storage of hydrocarbons or the disposal of waste, or a well used to inject fluid for the purpose of extracting sulphur by the thermofluid mining process.
(4) Commission--The Railroad Commission of Texas.
(5) Director--The director of the Oil and Gas Division or a staff delegate designated in writing by the director of the Oil and Gas Division or the commission.
(6) Existing brine mining injection well--A brine mining injection well in which injection operations began prior to the effective date of this section.
(7) Fresh water--Water having bacteriological, physical, and chemical properties that make it suitable and feasible for beneficial use for any lawful purpose.
(8) New brine mining injection well--A brine mining injection well in which injection operations begin on or after the effective date of this section.
(9) Permit--A written authorization issued by the commission under this section for the operation of a brine mining injection well.
(10) Person--A natural person, corporation, organization, government or governmental subdivision or agency, business trust, estate, trust partnership, association, or any other legal entity.
(11) Pollution--The alteration of the physical, chemical, or biological quality of, or the contamination of, water that makes it harmful, detrimental, or injurious to humans, animal life, vegetation or property or to public health, safety, or welfare, or impairs the usefulness or the public enjoyment of the water for any lawful or reasonable purpose.
(b) Prohibitions.
(1) Unauthorized injection. No person may operate a brine mining injection well without obtaining a permit from the commission under this section. No person may begin constructing a new brine mining injection well until the commission has issued a permit to operate the well under this section and a permit to drill, deepen, plug back, or reenter the well under §3.5 of this title (relating to Application to Drill, Deepen, Reenter, or Plug Back) (Statewide Rule 5).
(2) Fluid migration. No person may operate a brine mining injection well in a manner that allow fluids to escape from the permitted injection zone. If fluids are migrating from the permitted injection zone, the operator shall immediately cease injection operations.
(3) Falsifying documents and tampering with gauges. No person may knowingly make any false statement, representation, or certification in any application, report, record, or other document submitted or required to be maintained under this section or under any permit issued pursuant to this section, or falsify, tamper with, or knowingly render inaccurate any monitoring device or method required to be maintained under this section or under any permit issued pursuant to this section.
(c) Standards for permit issuance. A permit may be issued only if the commission determines that the operation of the brine mining injection well will not result in the pollution of fresh water. All permits issued under this section will contain the conditions required by subsections (f) and (g) of this section, and all other conditions reasonably necessary to prevent the pollution of fresh water.
(d) Permit application.
(1) Duty to apply. Any person who operates or proposes to operate a brine mining injection well shall file a permit application with the commission in Austin within the time provided in paragraph (2) of this subsection. The applicant shall mail or deliver a copy of the application to the appropriate district office on the same day the application is mailed or delivered to the commission in Austin. A permit application will be considered filed with the commission on the date it is received by the commission in Austin.
(2) Time to apply.
(3) Who applies. When a brine mining facility is owned by one person but is operated by another person, it is the operator's duty to file an application for a permit.
(4) Application requirements for all applicants. All applicants shall submit the following information, using application forms supplied by the commission:
(5) Additional information. The applicant shall submit any other information required on the application form supplied by the commission. In addition to the information reported on the application form, the applicant shall submit, at the director's request, any other information the commission may reasonably require to assess the brine mining injection well and to determine whether to issue a permit.
(e) Signatories to applications and reports.
(1) Applications. All applications shall be signed as follows:
(2) Reports. All reports required by permits and other information requested by the commission shall be signed by a person described in paragraph (1) of this subsection or by a duly authorized representative of that person. A person is a duly authorized representative only if:
(3) Certification. Any person signing a document under paragraph (1) or (2) of this subsection shall make the following certification: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or who are directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information."
(f) Conditions applicable to all permits. The conditions specified in this subsection apply to all permits.
(1) Duty to comply. The operator shall comply with all conditions of the permit. Any permit noncompliance is grounds for enforcement action, for permit termination, revocation and reissuance, or modification, or for denial of a permit renewal application.
(2) Duty to reapply. If the operator wishes to continue a permitted activity after the expiration date of the permit, the operator shall apply for and obtain a new permit.
(3) Need to halt or reduce activity not a defense. It is not a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of the permit.
(4) Duty to mitigate. The operator shall take all reasonable steps to minimize and correct any adverse effect on the environment resulting from noncompliance with the permit.
(5) Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control, and related appurtenances, that are installed or used by the operator to achieve compliance with the conditions of the permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up and auxiliary facilities or similar systems only when necessary to achieve compliance with the conditions of the permit.
Cont'd...