A permit application for off-lease commercial recycling of fluid shall include a detailed plan for closure of the facility when operations terminate. The closure plan shall address how the applicant intends to:
(1) remove waste, partially treated waste, and/or recyclable product from the facility;
(2) close all storage areas/cells;
(3) remove dikes and equipment;
(4) contour and reseed disturbed areas;
(5) sample and analyze soil and groundwater throughout the facility; and
(6) plug groundwater monitoring wells.
Source Note: The provisions of this §4.269 adopted to be effective April 15, 2013, 38 TexReg 2334