Sec. 43.0683. NOTICE OF PROPOSED ANNEXATION. Not later than the seventh day after the date the governing body of the municipality adopts the resolution under Section 43.0682, the municipality must mail to each resident and property owner in the area proposed to be annexed notification of the proposed annexation that includes:
(1) notice of the public hearing required by Section 43.0684;
(2) an explanation of the 180-day petition period described by Section 43.0685; and
(3) a description, list, and schedule of services to be provided by the municipality in the area on or after annexation as provided by Section 43.0682.
Added by Acts 2017, 85th Leg., 1st C.S., Ch. 6 (S.B. 6), Sec. 26, eff. December 1, 2017.