The following words and terms, when used in this subchapter, have the following meanings:
(1) Authorized representative--An individual representing all sponsors identified on an application for structural repair grant funds. The authorized representative shall be the single point of contact for all communications regarding an application.
(2) Eligible applicant--A partnership of all entities listed as a sponsor on a watershed agreement for a watershed project.
(3) Fiscal year--The 12-month period of time beginning September 1 of a year and ending on August 31 of the following year.
(4) Flood control dam--Floodwater retarding structures, also commonly referred to as flood control structures, watershed structures, flood prevention or "FP" sites, and certain grade stabilization structures included in the National Inventory of Dams built by the federal government under one of the four following federal authorizations:
(5) In-kind match--Non-monetary contributions of services, equipment, or other items of value included in a contract scope of work between the State Board and a sponsor for the purpose of satisfying all or a portion of a non-state funded matching requirement for structural repair activities. In-kind match is not eligible if the source is contributing the in-kind match because it was enabled to do so directly through state appropriations.
(6) National Inventory of Dams--The U.S. Army Corps of Engineers' list of dams first authorized by the National Dam Inspection Act (Public Law 92-367) of 1972.
(7) Natural Resources Conservation Service (NRCS)--An agency of the United States Department of Agriculture which was formerly known as the Soil Conservation Service.
(8) Operation and maintenance (O&M)--The activities associated with maintaining optimal physical conditions and functioning of a flood control dam specified in §529.2(9) of this chapter (relating to Definitions); O&M is not structural repair as defined in paragraph (14) of this section.
(9) O&M agreement--A written agreement pertaining to a specific flood control dam or dams within a watershed project, taking into consideration the powers and jurisdictional boundaries of sponsors, that specifies each sponsors' responsibilities for financing and performing O&M inspections and activities.
(10) Reimbursement request--A request for reimbursement of an activity included in a contract scope of work executed between the State Board and a sponsor.
(11) Soil and water conservation district (SWCD)--A governmental subdivision of this state and a public body corporate and politic, organized pursuant to Chapter 201 of the Agriculture Code.
(12) Sponsor--An entity or individual that is a signatory to a watershed project plan, watershed agreement, or O&M agreement.
(13) State Board--The Texas State Soil and Water Conservation Board organized pursuant to Chapter 201 of the Agriculture Code.
(14) Structural repair--The act of performing an activity or activities for the purpose of restoring a flood control dam to original design specifications (dam repair) or upgrading a flood control dam to meet current TCEQ safety criteria (dam upgrade). Structural repair is not an activity defined as operation and maintenance in §529.2(9) of this chapter. Structural repair activities include:
(15) Texas Commission on Environmental Quality (TCEQ)--The state agency created under Title 2, Subtitle A, Chapter 5 of the Texas Water Code (formerly the Texas Natural Resource Conservation Commission).
(16) Watershed agreement--A legal document that records the responsibilities of the sponsors and NRCS for implementing a watershed project plan relating to contributions of funding, the acquisition of land rights, construction, O&M, project administration, management of affected lands, as well as responsibilities regarding permitting and water and mineral rights.
(17) Watershed project--A geographic area delineated by the boundaries of a watershed within which a series of flood control dams have been constructed or are planned to be constructed by NRCS to prevent and/or minimize floodwater damage to lives and property.
(18) Watershed project plan (or Work Plan)--A plan developed by local sponsors with the assistance of NRCS for a watershed project that includes descriptions of the watershed, problems to be addressed, works of improvement to be installed, costs of installed works, project benefits, cost-benefit analyses, financing information, and general requirements for O&M.