(a) A contractor must submit for review an application and plans for the installation of new equipment.
(b) To apply for a plan review for the installation of new equipment, a contractor must:
(1) submit a completed application on a department-approved form;
(2) pay the fee required by §74.80; and
(3) submit layout drawings as specified in the ASME Code A17.1 adopted in §74.100 for the specific type of equipment to be installed. These layout drawings shall also include:
Source Note: The provisions of this §74.111 adopted to be effective July 1, 2012, 37 TexReg 4590; amended to be effective November 15, 2013, 38 TexReg 7949