(a) This section does not apply to plastic pipelines.
(b) By February 1, 2002, operators of intrastate transmission lines subject to the requirements of 49 CFR Part 192 or 49 CFR Part 195 shall have designated on a system-by-system or segment within each system basis whether the pipeline operator has chosen to use the risk-based analysis pursuant to paragraph (1) of this subsection or the prescriptive plan authorized by paragraph (2) of this subsection. Hazardous liquid pipeline operators using the risk-based plan shall complete at least 50% of the initial assessments by January 1, 2006, and the remainder by January 1, 2011; operators using the prescriptive plan shall complete the initial integrity testing by January 1, 2006, or January 1, 2011, pursuant to the requirements of paragraph (2) of this subsection. Natural gas pipeline operators using the risk-based plan shall complete at least 50% of the initial assessments by December 17, 2007, and the remainder by December 17, 2012; operators using the prescriptive plan shall complete the initial integrity testing by December 17, 2007, or December 17, 2012, pursuant to the requirements of paragraph (2) of this subsection.
(1) The risk-based plan shall contain at a minimum:
(2) Operators electing not to use the risk-based plan in paragraph (1) of this subsection shall conduct a pressure test or an in-line inspection and take remedial action in accordance with the following schedule:
(c) Within 185 days after receipt of notice that an operator's plan is complete, the Commission shall either notify the operator of the acceptance of the plan or shall complete an evaluation of the plan to determine compliance with this section.
(d) After the completion of the assessment required under either plan, the operator shall promptly remove defects that are immediate hazards and, no later than the next test interval, shall mitigate any anomalies identified by the test that could reasonably be predicted to become hazardous defects.
(e) If a pipeline that is not subject to this section undergoes any change in circumstances that results in the pipeline becoming subject to this section, then the operator of such pipeline shall establish integrity of the pipeline pursuant to the requirements of this section prior to any further operation. Such changes include but are not limited to an addition to the pipeline, change in the operating pressure of the pipeline, change from inactive to active status, change in population in the area of the pipeline, or change of operator of the pipeline segment. If a pipeline segment is acquired by a new operator, the pipeline segment can continue to be operated without establishing pipeline integrity as long as the new operator utilizes the prior operator's operation and maintenance procedures for this pipeline segment. If the population in the area of a pipeline segment changes, the pipeline segment can continue to operate without establishing pipeline integrity until such time as the operator determines whether or not the change in population affects the criteria applicable to the integrity management program, but for no longer than the time frames established under 49 CFR Part 192 or 195.
Source Note: The provisions of this §8.101 adopted to be effective April 30, 2001, 26 TexReg 3214; amended to be effective August 25, 2003, 28 TexReg 6829; amended to be effective November 24, 2004, 29 TexReg 10733; amended to be effective August 28, 2006, 31 TexReg 6715; amended to be effective March 2, 2009, 34 TexReg 1414; amended to be effective August 30, 2010, 35 TexReg 7743; amended to be effective January 6, 2020, 45 TexReg 121