Loading
Texas Administrative Code
/
Title 16 Economic Regulation
/
Part 1 Railroad Commission of Texas
/
Chapter 12 Coal Mining Regulations
/
Subchapter K Permanent Program Performance Standards
/
Division 2 Permanent Program Performance Standards--surface Mining Activities
Back
Rule 12.330 Signs and Markers
Rule 12.331 Casing and Sealing of Drilled Holes: General Requirements
Rule 12.332 Casing and Sealing of Drilled Holes: Temporary
Rule 12.333 Casing and Sealing of Drilled Holes: Permanent
Rule 12.334 Topsoil: General Requirements
Rule 12.335 Topsoil: Removal
Rule 12.336 Topsoil: Storage
Rule 12.337 Topsoil: Redistribution
Rule 12.338 Topsoil: Nutrients and Soil Amendments
Rule 12.339 Hydrologic Balance: General Requirements
Rule 12.340 Hydrologic Balance: Water-quality Standards and Effluent Limitations
Rule 12.341 Hydrologic Balance: Diversions
Rule 12.343 Hydrologic Balance: Sediment Control Measures
Rule 12.344 Hydrologic Balance: Siltation Structures
Rule 12.345 Hydrologic Balance: Discharge Structures
Rule 12.346 Hydrologic Balance: Acid-forming and Toxic-forming Spoil
Rule 12.347 Hydrologic Balance: Permanent and Temporary Impoundments
Rule 12.348 Hydrologic Balance: Ground-water Protection
Rule 12.349 Hydrologic Balance: Surface-water Protection
Rule 12.350 Hydrologic Balance: Surface and Ground-water Monitoring
Rule 12.351 Hydrologic Balance: Transfer of Wells
Rule 12.352 Hydrologic Balance: Water Rights and Replacement
Rule 12.353 Hydrologic Balance: Discharge of Water Into An Underground Mine
Rule 12.354 Hydrologic Balance: Postmining Rehabilitation of Sedimentation Ponds, Diversions, Impoundments, and Treatment Facilities
Rule 12.355 Hydrologic Balance: Stream Buffer Zones
Rule 12.356 Coal Recovery
Rule 12.357 Use of Explosives: General Requirements
Rule 12.358 Use of Explosives: Pre-blasting Survey
Rule 12.359 Use of Explosives: Blasting Schedule
Rule 12.360 Use of Explosives: Control of Adverse Effects
Rule 12.362 Use of Explosives: Records of Blasting Operations
Rule 12.363 Disposal of Excess Spoil: General Requirements
Rule 12.364 Disposal of Excess Spoil: Valley Fills
Rule 12.365 Disposal of Excess Spoil: Head-of-hollow Fills
Rule 12.366 Disposal of Excess Spoil: Durable Rock Fills
Rule 12.367 Protection of Underground Mining
Rule 12.368 Coal Processing Waste Banks: General Requirements
Rule 12.369 Coal Processing Waste Banks: Site Inspection
Rule 12.370 Coal Processing Waste Banks: Water Control Measures
Rule 12.371 Coal Processing Waste Banks: Construction Requirements
Rule 12.372 Coal Processing Waste: Burning
Rule 12.373 Coal Processing Waste: Burned Waste Utilization
Rule 12.374 Coal Processing Waste: Return to Underground Workings
Rule 12.375 Disposal of Noncoal Wastes
Rule 12.376 Coal Mine Waste: Dams and Embankments: General Requirements
Rule 12.377 Coal Mine Waste: Dams and Embankments: Site Preparation
Rule 12.378 Coal Mine Waste: Dams and Embankments: Design and Construction
Rule 12.380 Protection of Fish, Wildlife, and Related Environmental Values
Rule 12.381 Slides and Other Damage
Rule 12.382 Pipelines
Rule 12.383 Contemporaneous Reclamation
Rule 12.384 Backfilling and Grading: General Requirements
Rule 12.385 Backfilling and Grading: General Grading Requirements
Rule 12.386 Backfilling and Grading: Covering Coal and Acid- and Toxic-forming Materials
Rule 12.387 Backfilling and Grading: Thin Overburden
Rule 12.388 Backfilling and Grading: Thick Overburden
Rule 12.389 Stabilization of Surface Areas for Surface Mining
Rule 12.390 Revegetation: General Requirements
Rule 12.391 Revegetation: Use of Introduced Species
Rule 12.392 Revegetation: Timing
Rule 12.393 Revegetation: Mulching and Other Soil Stabilizing Practices
Rule 12.395 Revegetation: Standards for Success
Rule 12.397 Cessation of Operations: Temporary
Rule 12.398 Cessation of Operations: Permanent
Rule 12.399 Postmining Land Use
Rule 12.400 Roads: General
Rule 12.401 Primary Roads
Rule 12.402 Utility Installations
Rule 12.403 Support Facilities