For your control plan increment of progress, you must complete two items:
(1) Submit the final control plan, including a description of the devices for air pollution control and process changes that you will use to comply with the emission limits and other requirements of this division.
(2) You must maintain a copy of the final control plan at the same location as the solid waste incineration unit.
Source Note: The provisions of this §113.2106 adopted to be effective May 14, 2009, 34 TexReg 2771