You must submit to the executive director a signed copy of the contracts awarded to initiate onsite construction, initiate onsite installation of emission control equipment, and incorporate process changes. Submit the copy of the contracts with the notification that the increment of progress has been achieved to the executive director. You do not need to include documents incorporated by reference or the attachments to the contracts.
Source Note: The provisions of this §113.2107 adopted to be effective May 14, 2009, 34 TexReg 2771